TurbSim memory limitations with 0.005 s time step – Recommended temporal resolution for certification simulations

Dear NREL Team,

We are currently performing some preliminary tests with TurbSim to evaluate the influence of the wind-field time step on OpenFAST simulation results, particularly in the context of load calculations intended for wind turbine certification.

Our objective is to investigate whether reducing the TurbSim time step to 0.005 s, matching the time step used in our OpenFAST simulations, provides any meaningful improvement in the accuracy of the calculated loads compared to using a larger wind-field time step with temporal interpolation.

However, when attempting to generate these wind fields, we have encountered significant memory limitations. Even when running TurbSim on a relatively powerful Windows server with approximately 356 GB of RAM and 128 CPU cores, the process eventually fails. According to our IT team, the failure appears to be related to kernel memory exhaustion

We are using the TurbSim executables provided with the official OpenFAST v5.0.0 release.

We have also attempted to use the TurbSim_OpenMP.exe executable included in this release, which, according to the release notes, introduces OpenMP parallelization for matrix factorization and FFT operations. However, we have encountered execution issues with this version and have not yet been able to run it successfully.

For reference, the main parameters of our TurbSim configuration are:

  • TimeStep: 0.005 s

  • AnalysisTime: 600 s

  • UsableTime: ALL

  • NumGrid_Y / NumGrid_Z: 92 × 92

  • GridWidth / GridHeight: 258.58 m × 258.58 m

  • Turbulence model: IECKAI

  • IEC wind type: NTM

  • Output format: Bladed-style binary full-field wind (.wnd)

A corresponding TurbSim input file is followed for reference:

Beyond the memory limitation itself, we would particularly appreciate your guidance regarding the practical value of such a small wind-field time step.

Our intention is to perform a trade-off assessment between the computational cost of generating these high-resolution wind fields and the potential improvement in simulation results, especially when considering the requirements and expectations associated with wind turbine certification.

In this regard, we would appreciate your feedback on the following questions:

  1. Memory requirements: Is this level of memory consumption expected for the specified grid dimensions and time step? Are there any known limitations or recommended approaches to reduce memory usage in TurbSim without compromising the generated wind-field characteristics?

  2. OpenMP implementation: Could you please clarify the recommended configuration and use of TurbSim_OpenMP.exe in OpenFAST v5.0.0, particularly regarding the number of computational threads and the expected impact on execution time and memory consumption? Are there any known issues or additional requirements that should be considered when using this executable?

  3. Wind-field temporal resolution: Is there any technical advantage in matching the TurbSim time step to the OpenFAST simulation time step (0.005 s), or is temporal interpolation from a coarser wind-field time step generally considered sufficient?

  4. Certification considerations: Based on your experience, is there any evidence or recommendation supporting the use of such small wind-field time steps for IEC 61400-1 load calculations? In particular, could reducing the wind-field time step have a meaningful influence on the calculated extreme or fatigue loads?

  5. Recommended practice: What criteria would you recommend for selecting an appropriate TurbSim time step, considering the wind-field characteristics, turbine dynamics and computational requirements?

We are particularly interested in understanding whether the additional computational effort associated with generating wind fields at 0.005 s can be technically justified, or whether a larger time step, as the one by default at 0.05, would provide essentially equivalent results for certification purposes.

Thank you very much in advance for your support and recommendations.

Best regards,
Oscar

Dear @Oscar.Marnotes,

I don’t have personal experience with the OpenMP parallelized version of TurbSim, so, I can’t really comment on that. But here me responses related to your other questions:

  • Computational speed and memory requirements for the serial version of TurbSim have been discussed in old forum topics, e.g.,: TurbSim CPU Times and Memory Requirements for full-field wind arrays.
  • In terms of spatial extent in the YZ plane, we typically recommend defining the grid size to be large enough to encompass the rotor, including any possible displacements/deflections. You haven’t said what wind turbine you are considering, but a 259 m width and height implies you are simulating something like the IEA 15-MW RWT with a 240-m diameter rotor; if your turbine is smaller than this, you could probably get by with a smaller domain.
  • In terms of spatial resolution in the YZ plane, we typically recommend aiming for maximum chordlength, which is around 6 m for the IEA 15-MW RWT. However, your spatial resolution is double this, which implies you could reduce the number of grid points in half in each direction.
  • In terms of time resolution, turbulent energy decays with higher frequencies, and it is usually not important to capture energy above about 9-12P, where 1P represents the time it takes for one rotor revolution. The IEA 15-MW RWT spins slowly, with 12P equating to a TurbSim time step of 0.33 s (following the Nyquist sampling theorem). I wouldn’t use a time step larger than this, but there is not much reason to go much smaller. A TurbSim time step of 0.05 s is commonly recommend generically, but that itself is likely unnecessarily small for a 15-MW turbine. I really don’t see any benefit dropping it even further, so, even if you were able to generate a TurbSim output with a 0.005-s time step, I would not expect you’d see any difference compared to 0.05 s, or even 0.1 s for a 15-MW turbine.
  • If you reduce the number of grid points in half in each direction, and increase the time step by an order of magnitude or even more, I suspect TurbSim will run to completion without issue.

I hope that helps.

Best regards,

Dear Jason,

Thank you very much for your detailed response and recommendations.

Your explanation regarding the decay of turbulent energy at higher frequencies and the limited relevance of frequencies above approximately 9–12P is very helpful. We understand your reasoning and agree that, beyond a certain frequency, further increasing the temporal resolution of the wind field is unlikely to provide substantial additional information.

Nevertheless, I would like to clarify the reasoning behind our original question, as we are facing several interconnected limitations that make it difficult to assess the influence of the wind-field time step on our load calculations.

For context, we are currently working with a wind turbine with a rotor diameter of 140 m.

1. Our original objective: assessing the influence of wind-field temporal resolution

Our initial intention was to investigate whether generating turbulent wind fields with a time step of 0.005 s, matching our usual OpenFAST integration time step, could provide any measurable benefit compared with the commonly used TurbSim time step of 0.05 s.

We understand your argument that the additional turbulent energy at higher frequencies is relatively small and that the turbine’s response is unlikely to be significantly affected by it.

However, we would still like to quantify this potential influence rather than relying exclusively on theoretical considerations.

This is particularly relevant because our interest is not limited to obtaining sufficiently accurate loads for certification. We also intend to use these results in future structural optimization activities, where relatively small differences in calculated extreme or fatigue loads could become relevant when reducing the conservatism of preliminary component designs.

Unfortunately, as mentioned in our original post, we have been unable to carry out this comparison because TurbSim runs into memory limitations when generating wind fields with a time step of 0.005 s, even on our server with approximately 356 GB of RAM.

Therefore, while we understand that you would not expect significant differences between 0.05 s and 0.005 s, we have not been able to verify this for our particular model.

2. Why we cannot simply bring the OpenFAST integration time step closer to the wind-field time step

An alternative approach would be to increase the OpenFAST integration time step towards the commonly used TurbSim value of 0.05 s, thereby bringing both temporal resolutions closer together without requiring such computationally demanding wind fields.

We understand that the wind-field time step and the OpenFAST integration time step serve different purposes and do not necessarily need to be identical.

Nevertheless, this alternative would allow us to investigate the possibility of using comparable temporal resolutions while avoiding the difficulties associated with generating much finer turbulent wind fields.

The problem is that, in our current model, increasing the OpenFAST integration time step leads to numerical instabilities that appear to be associated with AeroDyn, particularly its unsteady aerodynamics (UA) implementation, something already commented by other members of the forum.

Although we expected improvements in this behavior with OpenFAST v5.0.0, we have continued to encounter these difficulties.

So far, the largest integration time step we have been able to run successfully is DT = 0.009 s, compared with our usual value of DT = 0.005 s.

For reference, we have performed comparisons using DT = 0.009 s and DT = 0.005 s, with different output sampling intervals. The overall load responses remain reasonably consistent, although some differences can be observed in the resulting time series.

Consequently, even if we wanted to bring the simulation time step closer to the commonly recommended wind-field time step, the numerical stability of our current OpenFAST model prevents us from doing so.

This leaves us in a situation where generating significantly finer wind fields is computationally prohibitive, while increasing the integration time step towards the existing wind-field resolution is also limited by numerical stability.

3. Additional concern regarding the future introduction of BeamDyn

There is a further aspect that concerns us.

Even if we managed to overcome the current limitations and demonstrate some benefit from using a finer wind-field time step, we expect to introduce BeamDyn in future iterations of our model.

We have noticed the following OpenFAST issue discussing numerical instabilities associated with AeroDyn’s unsteady aerodynamics when using BeamDyn:

The discussion indicates that, for certain configurations, considerably smaller integration time steps may be required to maintain numerical stability.

Although we understand that the specific behavior depends on the model configuration, this raises an important concern for our intended investigation.

If the introduction of BeamDyn forces us to reduce the OpenFAST integration time step even further, the difference between the simulation time step and the wind-field temporal resolution would increase again.

Consequently, even if we successfully established an appropriate balance between wind-field and simulation time steps for our current model, we could face the same question again when introducing BeamDyn.

This is why we are particularly interested in understanding whether matching the temporal resolutions of TurbSim and OpenFAST offers any actual technical advantage, or whether temporal interpolation from a coarser wind field is sufficiently accurate regardless of the smaller integration time step required by the numerical solver.

4. Technical justification and certification considerations

Ultimately, our concern is not that the wind-field and simulation time steps are different, but whether this difference could introduce any relevant loss of information in the resulting structural loads.

We understand that the integration time step must be selected according to the dynamic characteristics of the coupled turbine model and the numerical stability requirements of its modules.

Similarly, the wind-field time step should be sufficiently small to represent the turbulent frequencies that contribute meaningfully to the turbine response.

However, we would appreciate your guidance on how these two criteria should be evaluated together, particularly when numerical stability forces the use of a much smaller OpenFAST integration time step than the wind-field time step.

In this regard, we would particularly appreciate your opinion on the following:

  • Is there any known technical advantage in matching the TurbSim time step to the OpenFAST integration time step, or is interpolation from a coarser wind field generally sufficient, even when the integration time step is substantially smaller?

  • Are there any studies or previous sensitivity assessments that quantify the influence of wind-field temporal resolution on extreme or fatigue loads?

  • Are the numerical stability limitations associated with AeroDyn/UA expected to persist in OpenFAST v5.0.0, particularly when BeamDyn is introduced, or are there recommended configurations to mitigate these issues?

  • Regarding IEC 61400-1 certification, are there established recommendations or commonly accepted practices for selecting the TurbSim time step? More specifically, is the conventional combination of a 0.005 s OpenFAST integration time step and a 0.05 s TurbSim time step generally considered sufficiently accurate for certification-oriented load calculations?

We are not necessarily trying to justify using a TurbSim time step of 0.005 s as standard practice. Rather, we would like to understand whether the additional computational effort could provide meaningful benefits, particularly for load-sensitive structural optimization, or whether the commonly used 0.05 s resolution can be considered sufficiently accurate based on existing technical evidence.

If a finer wind-field resolution is considered worth investigating, any recommendations for overcoming the TurbSim memory limitations described in our initial post would also be greatly appreciated.

Thank you again for your time and support.

Best regards,

Oscar

Dear @Oscar.Marnotes,

Here are my responses:

  • For a 140-m diameter rotor, I would expect you’d be able to reduce GridWidth and GridHeight down to 150 m or so, and assuming a maximum chord length of 5 m, this would reduce NumGrid_Y and NumGrid_Z to 31, which should make TurbSim much faster, even with a small time step.
  • My understanding is that OpenFAST issue BeamDyn + UA_Mod=4 in dev-tc requires DT <= 0.001s · Issue #2813 · OpenFAST/openfast · GitHub is caused by the time-integrator implemented in AeroDyn for UA_Mod = 4 and 5, which requires a small time step, especially when BeamDyn is enabled. Unfortunately, the tight coupling function implemented in OpenFAST v5.0, which allows for OpenFAST models with BeamDyn to use much larger time steps than earlier versions, still requires smaller than desired time steps when UA_Mod = 4 or 5. A solution to this is to switch from UA_Mod = 4 or 5 to 3 (Minnema/Pierce variation of Beddoes-Leishman.
  • Given the low energy in turbulence at high frequencies, I would not expect there to be a sizeable benefit to aligning the TurbSim and OpenFAST times steps, but I would be interested to see your results, which may be possible if you reduce NumGrid_Y and NumGrid_Z as I recommend above. The InflowWind module of OpenFAST will 4D interpolate (3D in space + 1D in time) the wind velocities of the turbulence box to the aerodynamic analysis nodes; if you align the time steps, this will reduce to 3D interpolation (spatial only), but there is still interpolation nonetheless. Interpolation will smooth out some of the turbulence, but I expect the effect to be minimal if you follow the guidance for spatial-temporal discretization of TurbSim.

Best regards,